time tracked in workload
jen
Hi can you please add time tracked in workload. Workload was the initial time estimate. but if a project takes more time than the estimate. The workload should increase too. Thanks
Log In
K
Katrina Fahd
I can't believe this isn't a thing yet! I went to change it the other day to non estimated time, but realised it wasn't an option.
It would also be good to be able to have a filter for archived tasks to show as well, even if it does only show estimated time.
Alejandro Oñate Latorre
We need this point!
I would like it to count the MAX(estimated time, recorded time). That is, the estimated time until a higher amount is registered.
Farzin Ahmadi
Hi
please add this one, it's really usefull, sometimes some tasks get more than the estimation, and that makes workload look really empty, it would be awesome to switch to time tracked view, so it would be clear what happened on sprint
m
mike mullen
please add this. can't believe this request is from 3 years ago and this hasn't been added yet.
Julian Pustkuchen
Indeed this would be super helpful! OR add a separate "Timetracking" View type which shows all possible details, sums, exports etc. on time tracking. Currently this is totally missing.
M
Matthew Dimock
Just reiterating that the workload view in it's current state is only really helpful for allocating distribution of resources on an assignee basis. However, we need access within the settings to reference Time Tracked in order to utilize it as an actual capacity tracker. In fact, it would be super helpful if it read as follows: [Time Tracked]/[Time Estimated], that way we don't have to manually add in the soft limits ourselves.
Andreas Otto
It would also be helpful if the workload of teams could be displayed. This would allow us to move tasks that are in the team pool directly from the view to employees with free capacities.
Andreas Otto
Does Clickup have any interest in making the workload view work? At the moment it has zero value for capacity planning.
Pablo Cebria
Workload view is not useful unless it reflects just the REMAINING TIME (Expected - Registered) but currently reflects just EXPECTED. If we're tracking "workload" and we don't consider what has already been done we are tracking nothing and it does not help to properly manage teams.
T
Teddi Kao
And when the time is tracked, Workload View should not distrubute the time equally. Time tracked should fill the Capacity on the day it is tracked
Load More
→