Time Estimate equal to duration's and multiple by cost field for total cost of a job period of time
M
Monica Valle
Feature Request: Make it possible to connect the scheduled duration field of a task to its time estimate, and cost field so we can easily calculate labour costs.
Example:
If a task takes 5 hours ( input or automatically calculated in the duration field) and the labour rate is $20/hour, the cost should be:
5 hours x $20/hour = $100
Right now, there is no way to link the scheduled time ( automatically calculated duration field) to the time estimate for this kind of calculation.