Sync Planner Block Duration to Time Tracking
Piotr Liczba
Description:
I link my Planner Events to specific ClickUp Tasks. It would be a massive productivity boost if the time duration defined in the Planner could be automatically (or with one click) synced to the "Track Time" section of the linked task.
The Problem:
Right now, even though I have a 2-hour block clearly marked in the Planner, I still have to manually type "2h" into the Time Tracker of the task once I’m done. This is redundant manual entry.
Requested Feature:
A button or setting to "Log this Event duration as Tracked Time" for the assigned task.
Seamless integration between the scheduled time in Planner and the actual time tracking logs.
Log In
Adam Newton
I upvote this too! And when we have multiple tasks assigned in the one focus block, that it suggests the start time of the block for the first task, and then cascades the start time of the subsequent tasks in that block to commence as the finish time of the previous task.
I'd actually go a step further and have 'Auto tracked time" which suggests prepopulated time on tasks (even split between tasks in a block) and counts that automatically as time spent, unless you then override suggested times.
That way our reporting for time spent on tasks can be automatically deduced from the planner without intervention.
Tracy Logan
I would love this feature as well. I do love being able to map out my day, make any adjustments to the day, but maybe at the end of the day, there is a popup that asks if you planned day is accurate, you could click Yes and it add that time to each project that is blocked for that day.