This is a simple feature request. Using the old links, we were able to change the status of a linked task just by hovering the mouse over the task and clicking directly on the status. Would it be possible to do something similar with relationships? That ended up being very useful.
Also, it would be great if we could link multiple tasks at a time without having to press the plus button each time.