Duration field
closed
Lamya Elhosseiny
i know we can add such a field with (Formula custom field) but we need to stuck it so if we changed one of the (start or due) it changes the other due to the duration , as we have this option in MS project and it is very useful
Log In
B
Brian Shen
closed