Allow "Sync dates with subtasks" to be set at the Space level
building now
C
Cliff Paul
Currently, subtask date sync can only be enabled per List or per task. If you manage a Space with many Lists (and regularly create new ones), you have to remember to turn this on every single time. It would be much better if we could enable subtask date sync as a Space-level default so that every List (existing and future) in that Space inherits the setting automatically. Power users managing complex projects with lots of subtask hierarchy really need this to avoid manual repetition and inconsistent behavior across Lists.
Log In

Vasil Enchev
updated the status to
building now
This is being built: a Space-level default for syncing dates with subtasks, so new Lists pick it up without you switching it on each time.